National Highway Authority NHA Jobs May 2023
National Highway Authority NHA Jobs May 2023
Organization: National Highway Authority NHA
Position: Multiple
Newspaper: Express
- Applications are invited for following project posts to be filled on contract basis in National Highway Authority as per detail given below:-
S# | Name of Posts with BS | Total No. of Posts | Prescribed on Qualification | Experience | Age Limit | Projects | No. of posts In each project | ย |
1 | Deputy Director (Eng r) BS-1 8 | 33 3 | B. Sc (Civil) | 07 years in the relevant field | 40 | Construction of Athmuqam -Sharda-Kel -Taobat Road Section (109.2 km) including two tunnels at Kahori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road. AJ&K Deposit Work | 04 | ย |
Dualization of Khuzdar โ Kuchlak Section of National Highway (N-25) 330KM | 05 | |||||||
M. Sc (Civil) | 04 years in the relevant field | 40 (Relaxable by 3 years) | ||||||
Construction of Rajanpur-DG Khan as a 4-lane Highway (ADD) | 03 | ย | ||||||
D.G. Khan โ D.I. Khan (ACW) (N-55) โ 208.19 Kits (CAREC Corridor. ADB) | 04 | ย | ||||||
Dualization & Improvement of Existing N-50 from Yank โ Sagu -Zhob including Zhob Bypass (210 km) | 02 | |||||||
Ph. D (Civil) | 02 years in the relevant field | 40 (Relaxable by 5 years) | ||||||
Khyber Pass Economic Corridor Project (Revised) (World Bank) | 06 | ย | ||||||
Dualization and Rehabilitation of Karachi โ Kararo (232 kms) & Wadh โ Khuzdar (41 Kms) (Total Length 273 kms) โ N-25 | 02 | ย | ||||||
Dualization and Rehabilitation of Kararo โ Wadh (83 kms) & Kuchlak โ Chaman (104 Kms) (Total Length 187 kms) โ NI-25 | 05 | ย | ||||||
Rehabilitation & Upgradation of Pezu-Tank Road (38 Km) | 01 | ย | ||||||
Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass. Sihala Bypass & Kahuta Bypass | 01 | ย | ||||||
3 | Deputy Director (LM & IS) BS-18 | 01 | LLM | 10 Years in the relevant field | 40 (Relaxable by 2 years) | Construction of Additional Carnage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) | 01 | ย |
LLB | 10 Years in relevant field | 40 | ย | |||||
Assistant Director (Engineer) BS-17 | 33 | B.SC Civil 1โณ Class or M.SC in Relevant Subject | Nil | 35 | Construction of Athmuqam -Sharda-Kel -Taobat Road Section (109.2 km) including two tunnels at Kahori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road. AJ&K Deposit Work | 04 | ย | |
Construction of Chitral โ Garam Chashma Road Project (82.5 km) | 02 | ย | ||||||
Construction of Rajanpur-DG Khan as a 4-lane Highway (ADB) | 02 | ย | ||||||
D.G. Khan โ D.I. Khan (ACW) (N-55) โ 208.19 kms (CAREC Corridor. ADS) | 02 | ย | ||||||
Dualization & Improvement of Existing N-50 from Yank โ Sagu -Zhob including Zhob Bypass (210 km) | 02 | ย | ||||||
Dualization of Khuzdar โ Kuchlak Section of National Highway (N-25) 330KM | 05 | ย | ||||||
Khyber Pass Economic Corridor Project (Revised) (World Bank) | 07 | ย | ||||||
Dualization and Rehabilitation of Karachi โ Kararo (232 kms) & Wadh โ Khuzdar (41 Kms) (Total Length 273 krns)- N-25 | 02 | ย | ||||||
Rehabilitation & Upgradation of Pezu-Tank Road (38 Km) | 01 | ย | ||||||
Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass. Sihala Bypass & Kahuta Bypass | 01 | ย | ||||||
Dualization and Rehabilitation of Kararo โ Wadh (83 kms) & Kuchlak โ Chaman (104 Kms) (Total Length 187 kms) N-25 | 05 | ย | ||||||
4 | Assistant Director (LM & IS) BS-17 | 03 | LLB | Nil | 35 | D.G. Khan โ D.I. Khan (ACW) (N-55) โ 208.19 kms (CAREC Corridor. ADB) | 01 | ย |
Khyber Pass Economic Corridor Project (Revised) (World Bank) | 01 | ย | ||||||
Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass | 01 | ย | ||||||
5 | Qanoongo BS-9 | 10 | Matric with Patwar/ Tapedar Course | 10 years in the relevant field | 25 | Construction of Additional Carriage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) | 02 | ย |
Construction of Athmuqam -Sharda-Kel โ Taobat Road Section (109.2 km) including two tunnels at Ka hon/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road, AJ&K Deposit Work | 02 | ย | ||||||
Construction of Rajanpur-DG Khan as a 4-lane Highway (ADS) | 01 | ย | ||||||
D.G. Khan โ D.I. Khan (ACW) (N-55) โ 208.19 kms (CAREC Corridor. ADB) | 01 | ย | ||||||
Khyber Pass Economic Corridor Project (Revised) (World Bank) | 01 | ย | ||||||
Dualization and Rehabilitation of Karachi โ Kararo (232 kms) & Wadh โ Khuzdar (41 Kms) (Total Length 273 kms) โ N-25 | 01 | ย | ||||||
Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass | 02 | ย | ||||||
6 | Patwari BS-5 | 16 | Matric withย ย ย ย Nil Patwar/ Tapedar Course | 25 | Construction of Additional Carriage way Shikarpur-Rajanpur Section of N-55 CAREC Corridor (ADB) | 02 | ย | |
Construction of Athmuqam -Sharda-Kel โ Taobat Road Section (109.2 km) including two tunnels at Ka hori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road, AJ&K Deposit Work | 02 | ย | ||||||
Construction of Chitral โ Garam Chashma Road Project (82.5 krn) | 02 | ย | ||||||
Construction of Rajanpur-DG Khan as a 4-lane Highway (ADB) | 01 | ย | ||||||
D.G. Khan โ D.I. Khan (ACW) (N-55) โ 208.19 kms (CAREC Corridor, ADB) | 01 | ย | ||||||
Khyber Pass Economic Corridor Project (Revised) (World Bank) | 01 | ย | ||||||
Dualization and Rehabilitation of Karachi โ Kararo (232 knis) & Wadh โ Khuzdar (41 Kms) (Total Length 273 krns)- N-25 | 01 | ย | ||||||
Dualization of Rawalpindi-Kahuta Road including 4-Lane Brdige over Sihala Railway Pass, Sihala Bypass & Kahuta Bypass | 06 | ย |
- The above mentioned posts will be filled on Standard Pay Package for project staff alongwith other terms& conditions as approved by Finance Division, Regulation Wing vide O.M No. F.No. 4(9) R-14/2008 dated 18.04.2022 and Establishment Division O.M No. 9/4191.R.S dated 28.01.2008. The package will be all inclusive and no additional facility shall be admissible.
- The project employees will be appointed on contract basis for initial period not exceeding two years which will be extendable further till the completion period of the project on yearly basis after evaluation of their performance.
- Age relaxation will be admissible as per Federal Government instructions.
- The Requisite experience mentioned against each post must be in relevant field and post qualified. Experience gained before passing the requisite qua li float ion will not be countable.
- Selected candidates will be posted on respective projects provided in the 2Thd last column of advertisement.
- Only shortlisted candidates who fulfill the criteria will be called for written test/ interview as the case may be.
- The interested candidates shall apply online through NHA website (https:/lnha.gov.pk/index.php/sitepages/topic/24456 or https://nha.gov.pk (career in menu)) alongwith attested copies of requisite testimonials/documents within 15 DAYS of the Publication of this advertisement. The candidates shall also required to forward hard copy of application form alongwith attested copies of requisite testimonials/documents on the below mentioned mailing address.
- Mere submission of application form in hard shape without submission of online application form/documents shall not be accepted/entertained.
- The interested candidates are required to mention post applying for on the right top corner of the envelope when they send their applications. In case of applying for more than one post. separate formlenvelope should be used.
- No TA/DA will be paid to those candidates who will be called for test/ interview.
ABDUL GHAFFAR FAROOQI
DIRECTOR (RECRUITMENT)
National Highway Authority
27-Mauve Area, G-9/1, Islamabad, Phone: 051-9032838
National Highway Authority NHA Jobs May 2023
Register & Apply Online
Jobs By Cities
Jobs By Field
Jobs By Organization